Skip to content

Services

A wider scope, from the work.

Design and engineering, plus the sites clinics, station networks and climate firms ask for. Open a practice to see what is in scope.

(02)Sector context

Why the scope looks like this.

Three sectors we already ship for, and the change that widened the offer. We design and build the site and the tools. Clinical judgment and emissions verification stay with the specialist.

  1. 01Care

    The decision starts on the site

    A hospital, a surgeon or a psychologist is compared before anyone calls. Visitors look for the departments or the procedures, the person they would meet, and a way to ask for a time. When patients read in more than one language, a single Turkish page is not enough. A self-check belongs in the browser, and the page should say what it does not promise.

  2. 02Climate

    2026 is the first CBAM year that is filed

    The EU's carbon border levy entered its definitive period on 1 January 2026. It covers steel, cement, aluminium, fertilisers, hydrogen and electricity. The importer files. The plant is asked for the emissions embedded at the installation. The first annual declaration, for 2026 imports, is due on 30 September 2027. Firms want a page that explains the work and a calculator that gives a first estimate. Verification stays with an accredited verifier.

  3. 03Networks

    The public site is the network

    A fuel company is not one address. Visitors look up stations, a fleet card and the company itself. The site has to carry the list, the application and the story without sending people to three different places. The same shape fits any operator whose offer is a set of locations plus a service on top.

Let’s build what’s next.

Start a project